SALEM HUNT FINAL ENVIRONMENTAL IMPACT STATEMENT (FEIS)

Date on document:
August 7, 2009

SALEM HUNT SITE DEVELOPMENT PLAN

Date on document:
May 20, 2008

Click directly on link to open in browser, or right-click, then “save target as” to save file to your hard disk (recommended).

Report:

Appendices:

Supplementary CD:

Click directly on link to open in browser, or right-click, then “save target as” to save file to your hard disk (recommended).

Draft Environmental Impact Statement (DEIS):

Main Report:
Download Main Report (1.4 MB)

Appendices:
Download Appendices (110 MB)

Report Figures and Drawings:
Fig 2-1 Site on Location Map.pdf
Fig 2-2 Existing Conditions.pdf
Fig 2-3 Site on Aerial Photo.pdf
Fig 2-4 Proposed Site Plan.pdf
Fig 2-5 Propo Bldg Elev 2 Unit Front Gar.pdf
Fig 2-6 Propo Bldg Elev 2 Unit Front and side Gar.pdf
Fig 2-7 Propo Bldg Elev 3 Unit Front and side Gar.pdf
Fig 2-8 Propo Bldg Elev 3 Unit Side Gar.pdf
Fig 3-1 Land Use Map.pdf
Fig 3-2 Site on Aerial Photo.pdf
Fig 3-3 Zoning Map.pdf
Fig 3-4 Multifamily Variance.pdf
Fig 4-1 Existing Vegetative Communities.pdf
Fig 4-2 Vegetation Plots Outside of Tree Survey Area.pdf
Fig 5-1 Aquifer Drainage Areas.pdf
Fig 5-2 Pumping Test Locations.pdf
Fig 5-3 Pumping Test Monitoring Locations_Rev.pdf
Fig 5-4 Well Location Map.pdf
Fig 5-5 Nitrate Concentrations.pdf
Fig 6-1 Muscoot Watershed.pdf
Fig 6-2 Surface Water Drainage Patterns.pdf
Fig 6-3 NYS Wetlands Map.pdf
Fig 6-4 Site on NWI Map.pdf
Fig 6-5 Existing Conditions.pdf
Fig 6-6 Pre Development Drainage Areas.pdf
Fig 6-7 Post Development Drainage Areas.pdf
Fig 6-8 Site Location within the Muscoot Reservoir Watershed.pdf
Fig 7-1 Local Topography.pdf
Fig 7-2 Existing Slopes Map.pdf
Fig 7-3 Site on Soils Map.pdf
Fig 7-4 Soils Investigation Plan.pdf
Fig 7-5 Slopes Disturbance Map.pdf
Fig 7-6 Earthwork Map.pdf
Fig 8-1 Potential Viewshed Map.pdf
Fig 8-2 Key Map to Visual Assessment.pdf
Fig 8-3 Existing Stone Walls.pdf
Fig 8-4 View toward site from Starlea and June Road Int.pdf
Fig 8-5 View toward site from Hardscrabble at Delancy Road.pdf
Fig 8-6 View toward site from Hardscrabble.pdf
Fig 8-7 View toward site from Vails Lake Shore Drive.pdf
Fig 8-8 View of Site from Volunteer Park Winter.pdf
Fig 8-9 Visual Profile with Sight Line from June Road.pdf
Fig 8-10 Visual Profile with Sight Line from Hardscrabble Road.pdf
Fig 8-11 Visual Profile with Sight Line from Volunteer Park.pdf
Fig 8-12 Post Development View of Site from Volunteer Park Winter.pdf
Fig 9-1 Site Location.pdf
Fig 9-2 Existing AM Peak Hour Traffic.pdf
Fig 9-3 Existing PM Peak Hour Traffic.pdf
Fig 9-4 No Build AM Peak Hour Traffic.pdf
Fig 9-5 No Build PM Peak Hour Traffic.pdf
Fig 9-6 Proposed Site Plan.pdf
Fig 9-7 Percent Dist Peak Hour Traffic.pdf
Fig 9-8 Site Gen AM Peak Hour Traffic.pdf
Fig 9-9 Site Gen PM Peak Hour Traffic
Fig 9-10 Build AM Peak Hour Traffic
Fig 9-11 Build PM Peak Hour Traffic.pdf
Fig 14-1 Propo Bldg Elev 2 Unit Front and side Gar.pdf
Fig 14-2 Currently Proposed.pdf
Fig 14-3 Previous 75 Unit Pl…pdf
Fig 14-4 Walkable Community Alternative.pdf
Fig 14-5 Fee Simple Alternatitive.pdf