STATELINE RETAIL CENTER FEIS
Date on document:
August 10, 2009
STATELINE RETAIL CENTER DEIS
Date on document:
June 20, 2008
Click directly on link to open in browser, or right-click, then “save target as” to save file to your hard disk (recommended).
Main Report:
- Cover & Table of Contents (41 KB)
- Introduction (4.5 MB)
- 1.0 Executive Summary (16 KB)
- 2.0 Project Description Comments & Response (9 MB)
- 3.1 Land Use, Zoning Comments & Response (556 KB)
- 3.2 Community Services Comments & Response (26 KB)
- 3.3 Economic Conditions Comments & Response (624 KB)
- 3.4 Cultural Resources Comments & Response (47 KB)
- 3.5 Natural Resources Comments & Response (43 KB)
- 3.6 Geology Comments & Response (24 KB)
- 3.7 Water Resources & Wetlands Comments & Response (4.3 MB)
- 3.8 Stormwater Management Comments & Response (1.7 MB)
- 3.9 Traffic & Transportation Comments & Response (28 KB)
- 3.10 Air Quality Comments & Response (16 KB)
- 3.11 Noise Comments & Response (16 MB)
- 3.12 Construction Comments & Response (16 KB)
- 3.13 Infrastructure & Energy Comments & Response (39 KB)
- 4.0 Alternatives Comments & Response (1.3 MB)
- 5.0 Mitigation Comments & Response (16 KB)
- 6.0 Unavoidable Adverse Impacts Comments & Response (17 KB)
- 7.0 Irreversible Irretrievable Commitmnt to Resources Comments & Response (17 KB)
- 8.0 Growth Inducement & Cumulative Impacts Comments & Response (17 KB)
- 9.0 Energy Consumption-Conservation Comments & Response (17 KB)
Appendices:
- Appendix A: Public Hearing Transcripts (3.5 MB)
- Appendix B: Written Comments Received on the DEIS (3.6 MB)
- Appendix C: 3-D Renderings and Animation (370 KB)
- Appendix D: Project Architecture and Building Elevations (2.8 MB)
- Appendix E: Correspondence (602 KB)
- Appendix F: Stormwater Pollution Prevention Plan (4.6 MB)
- Appendix G: Wastewater Report (1.3 MB)
- Appendix H: Archeology (239 KB)
3D Drive-by Simulation:
- Download 3D Simulation (Windows Media, 52 MB)
Click directly on link to open in browser, or right-click, then “save target as” to save file to your hard disk (recommended).
Volume I – Main Report:
- Cover & Table of Contents (276 KB)
- 1.0 Executive Summary (143 KB)
- 2.0 Project Description (48 MB)
- 3.1 Land Use, Zoning (107 MB)
- 3.2 Community Services (39 KB)
- 3.3 Economic Conditions (6.5 MB)
- 3.4 Cultural Resources (28 KB)
- 3.5 Natural Resources (35.3 MB)
- 3.6 Geology (9 MB)
- 3.7 Water Resources & Wetlands (6.3 MB)
- 3.8 Stormwater Management (62 MB)
- 3.9 Traffic & Transportation (45 MB)
- 3.10 Air Quality (108 KB)
- 3.11 Noise (35 MB)
- 3.12 Construction (106 KB)
- 3.13 Infrastructure & Energy (2.8 MB)
- 4.0 Alternatives (35.6 MB)
- 5.0 Mitigation (48 KB)
- 6.0 Unavoidable Adverse Impacts (55 KB)
- 7.0 Irreversible Irretrievable Commitmnt to Resources (63 KB)
- 8.0 Growth Inducement & Cumulative Impacts (99 KB)
- 9.0 Energy Consumption-Conservation (71 KB)
Volume II – Appendices:
- Appendix A: SEQRA Documentation (810 KB)
- Appendix B: Correspondence & Contacts (1.7 MB)
- Appendix C: Economic Impact Analysis (220 KB)
- Appendix D: Phase I Archeological & Phase II Site Survey (23.6 MB)
- Appendix E: Breeding Bird Atlas Data (1.3 MB)
- Appendix F: Boring Logs and Locations (365 KB)
- Appendix G: Subsurface Investigation Work Plan (567 KB)
- Appendix H: Preliminary Hydrogeologic Study (3 MB)
- Appendix I: Preliminary Wastewater Report (18.6 MB)
- Appendix J: Blasting Protocol (63 KB)
- Appendix K: Preliminary Stormwater Pollution Prevention Plan (3.6 MB)
- Appendix L: Level of Service Calculations (3.2 MB)
- Appendix M: PART and HART Bus Routes (2.4 MB)
- Appendix N: No Build Project Traffic Information (61 KB)
- Appendix O: The Reserve Traffic Data (69 KB)
- Appendix P: Preliminary Wastewater Report (190 KB)
- Appendix Q: Wetland Soils Examination (3.6 MB)
- Appendix R: Carlin-Simpson Geotechnical Report (2.7 MB)
- Appendix S: Noise Calculations (121 KB)
- Appendix T: Preliminary Traffic Signal Warrant Summary (198 KB)
3D Drive-by Simulation:
- Download 3D Simulation (Windows Media, 52 MB)