Tim Miller Associates
  • Home
  • About
    • Clients
    • Projects
      • Connecticut
      • New Jersey
      • New York
      • New York City
    • Staff
  • Public Review
  • Services
    • Feasibility/Fiscal Studies
    • Environmental Site Assessments
    • Municipal Planning
    • Environmental Planning SEQRA/EIS
    • Site Plan & Landscape Design
    • Traffic
    • Wetlands & Ecology
  • Blog
  • Contact
Select Page

WATERS EDGE AT DOBBS FERRY DEIS

Date on document:
Feb. 1, 2007

Click directly on link to open in browser, or right-click, then
“save target as” to save file to your hard disk (recommended).

Volume 1: Main Report:

  • Vol 1 Cover and Table of Contents
  • 1.0 Executive Summary
  • 2.0 Description of Proposed Action
  • 3.0 Existing Setting, Potential Impacts and Mitigation, and 3.1 Soils and Topography
  • 3.2 Surface Water Resources
  • 3.3 Terrestrial and Aquatic Ecology
  • 3.4 Aesthetic and Cultural Resources
  • 3.5 Critical Environmental Areas
  • 3.6 Transportation
  • 3.7 Energy and 3.8 Noise
  • 3.9 Public Health, 3.10 Safety, 3.11 Community Character, 3.12 Fiscal Analysis and 4.0 Unavoidable Adverse Impacts
  • 5.0 Alternatives, 6.0 Irreversible and Irretrievable Commitments of Resources and 7.0 Growth Inducing Aspects of the Proposed Action

Volume 2: Appendices:

  • Appendix A – SEQRA Documentation
  • Appendix B – Stormwater Pollution Prevention/Erosion Control Plans
  • Appendix C – Report of Investigation of Fairlawn Ave Slope Failure
  • Appendix D – Drainage Report
  • Appendix E – Correspondence
  • Appendix F – Traffic Volumes US Rte 9 & Traffic Count Sheets
  • Appendix G – Phase I – Team Consultants
  • Appendix H – Geotechnical Report
  • Appendix I – Full Environmental Assessment Form
  • Appendix J – Village of Dobbs Ferry Budget 2006-07
©2017 Tim Miller Associates, Inc., All Rights Reserved