Lost Lake
Resort DEIS
Date on document:
May 20, 2010
Lost Lake
Resort FEIS
Date on document:
March 21, 2011
Click here to jump to the Lost Lake Resort FEIS at the botttom of this page
Click directly on link to open in browser, or right-click, then “save target as” to save file to your hard disk (recommended).
- Adopted Scoping Document (Date Adopted: 06/11/09)
- Notice of Completion
Volume 1: Main Report:
- Title Page & Table of Contents (103 KB)
- 1.0 Executive Summary (139 KB)
- 2.0 Description of Proposed Action (12.4 MB)
- 3.1 Geology, Soils and Topography (19.4 MB)
- 3.2 Wetlands (4.2 MB)
- 3.3 Vegetation (3 MB)
- 3.4 Wildlife Ecology (3.7 MB)
- 3.5 Water Resources (6 MB)
- 3.6 Zoning, Land Use and Public Policy (3.3 MB)
- 3.7 Historic and Archaeological Resources (21 KB)
- 3.8 Transportation (5 MB)
- 3.9 Fiscal & Employment Analysis (86 KB)
- 3.10 Community Services (66 KB)
- 3.11 Noise (312 KB)
- 3.12 Visual Resources (5.6 MB)
- 4.0 Alternatives (1.7 MB)
- 5.0 Adverse Environmental Impacts that Cannot be Avoided if the Project is Implemented (20 KB)
- 6.0 Irreversible and Irretrievable Commitments of Resources (13 KB)
- 7.0 Growth Inducing Impacts of the Proposed Action (1.6 KB)
- 8.0 Effects on the Use and Conservation of Energy Resources (91 KB)
- 9.0 References (41 KB)
Volume 2: Appendices:
- Volume 2 Title Page & Table of Contents (16 KB)
- Appendix A: SEQR Documentation (220 KB)
- Appendix B: Correspondence (18 MB)
- Appendix C: Buildout Scenarios (120 KB)
- Appendix D: Preliminary Road Profiles and Construction Details (7 MB)
- Appendix E1: Declaration of Exceptions, Reservations, Covenants, Restrictions and Conditions for the Lost Lake Resort and Development (52 KB)
- Appendix E2: Design Guidlines for Single Family Homes in the Lost lake Resort (184 KB)
- Appendix F: Bedrock Outcrops Along St. Joseph’s Road (1.8 MB)
- Appendix G1: Preliminary Stormwater Pollution Prevention Plan and Erosion and Sediment Control Report (1.5 MB)
- Appendix G2: Supporting Calculations (1.5 MB)
- Appendix H: Vernal Pool Data Sheets (7.8 MB)
- Appendix I: Timber Rattlesnake Habitat Assessment (1.8 MB)
- Appendix J: Breeding Bird Data (7.3 MB)
- Appendix K: Water and Wastewater Systems Report and Conceptual Design Plans – Utility Plans Plans and Watertank Details (25 MB)
- Appendix L: Revised Preliminary Water Quality Management Plan (4.5 MB)
- Appendix M1: Lost Lake Resort Water Supply Report (19 MB)
- Appendix M2: Groundwater Sampling Lab Results (6 KB)
- Appendix N: Town of Forestburgh PDD Regulation (83 KB)
- Appendix O: Archaeological Phase 1A Literature Review and Sensitivity Analysis (4.5 MB)
- Appendix P1: Traffic Measures of Effectiveness (20 KB)
- Appendix P2: Traffic Figures and Tables (1.8 MB)
- Appendix P3: Level of Service Summary Tables (22 KB)
- Appendix P4: Traffic Level of Service Calculations (9 KB)
- Appendix Q: Traffic Based Noise Analysis Calculations (99 KB)
- Appendix R: Sullivan County Fire Mutual Aid Plan (199 KB)
- Appendix S: Orange and Rockland Service Area (506 KB)
- Appendix T: 24-hour Noice Monitoring Data (62 MB)
- Appendix U: Evaluation of Lost Lake for Irrigation Water (1.5 MB)
Supplementary CD:
- Appendix G1 Preliminary Stormwater Pollution Prevention Plan and Erosion and Sediment Control Report (Sections 1 through 7 Appendices) (1.5 MB)
- Appendix G2 Supporting Calculations (Section 8) (67 MB)
- Appendix M2 Groundwater Sampling Laboratory Results (6.2 MB)
- Appendix P4 Traffic Level of Service Calculations (2 MB)
- Preliminary Design Plans (41 MB)
- Preliminary Phase 1 Plans – Erosion and Sediment Control and Stormwater Mgt (38 MB)
- Conceptual Design Plans – Landscape (1.2 MB)
- Conceptual Design Plans – Utilities (26 MB)
Click directly on link to open in browser, or right-click, then “save target as” to save file to your hard disk (recommended).
- Notice of Completion and Filing of the Final EIS April 7, 2011
- Addendum to the Final EIS and Notice of Completion April 20, 2011
Main Report:
- Title Page & Table of Contents
- 1.1 Summary)
- 2.7 Project Description Comments and Responses)
- 3.14 Geology, Soils and Topography Comments and Responses
- 3.2.4 Wetlands Comments and Responses)
- 3.3.4 Vegetation Comments and Responses
- 3.4.4 Wildlife Ecology Comments and Responses
- 3.5.4 Water Resources Comments and Responses
- 3.6.4 Zoning, Land Use and Public Policy Comments and Responses)
- 3.7.4 Historic and Archaeological Resources Comments and Responses
- 3.8.10 Transportation Comments and Responses
- 3.9.8 Fiscal & Employment Analysis Comments and Responses
- 3.10.9 Community Services Comments and Responses
- 3.11.4 Noise Comments and Responses
- 3.12.4 Visual Resources Comments and Responses
- 4.8 Alternatives Comments and Responses
- 5.1 Unavoidable Adverse Impacts Comments and Responses
- 6.1 Commitment of Resources Comments and Responses
- 7.1 Growth-Inducing Impacts Comments and Responses
- 8.5 Use and Conservation of Energy Comments and Responses
Appendices:
- Appendix A: SEQR Documentation
- Appendix B: Correspondence
- Appendix C:Public Hearing Transcript
- Appendix D: Written Comments Received on the DEIS
- Appendix E: Addendum to Water Supply Report
- Appendix F: Bog Turtle Habitat Evaluation Forms
- Appendix G: Archaeological Reports (Supersedes DEIS Appendix O)
- Appendix H: Traffic Count Data
- Appendix I: Preliminary Road Profiles and Construction Details (Sheets C-13 to C-35) (Supersedes DEIS Appendix D)
- Appendix J: Conceptual Water and Sewer System Plans (Sheets 1 to 14)
(Supersedes DEIS Appendix K, Attachment F) - Appendix K: Waste Assimilative Capacity Analysis for WWTP Discharge
Supplementary CD: